Digging complete

Digging complete

After about 4 days' digging (mainly in the rain) the excavations are complete.  The coarse gravel has been put in the bottom and leveled out.

View from Ringstraße along centre of house

View from corner of Blüten Weg and Ringstraße
 The Bauschild (building notice?) is hanging in a plastic sleeve on the gate, rather than on a 3 x 2 metre plaque as originally proposed.


 In order to try and prevent any big flooding problems, the engineers have installed a pump in the bottom of the hole which is working 24 x 7, making a sort of slurpy noo-noo noise.  It seems to be sucking mainly air.