Cellar windows inserted
The first couple of cellar windows have been put in the shuttering.
|
Exterior shuttering showing windows |
There was a bit of water from the rain but nothing critical. I gave the builders a bag of jammy donuts to cheer them up.
|
Front chap standing where heat pump should end up |
I followed the builders track (a bit like an inverted construction ramp used on the pyramids) right down to the shuttering. They were lowering the internal shuttering with the crane.
|
Internal shuttering being lowered in by crane |
Keine Kommentare:
Kommentar veröffentlichen