Mittwoch, 28. November 2012

Cellar windows inserted

Cellar windows inserted

The first couple of cellar windows have been put in the shuttering.

Exterior shuttering showing windows
There was a bit of water from the rain but nothing critical.  I gave the builders a bag of jammy donuts to cheer them up.
Front chap standing where heat pump should end up
I followed the builders track (a bit like an inverted construction ramp used on the pyramids) right down to the shuttering.  They were lowering the internal shuttering with the crane.

Internal shuttering being lowered in by crane