The final preparations have been made before the exterior plastering can start. The scaffolding is up, the windows are covered with plastic sheets (it gets pretty stuffy at night) and there is a huge plaster hopper in the drive.
Also, a second high power outlet has been installed in the cellar. Before I had a bright red 16 amp connection point (why?). Now I have an additional chunkier looking 32 amp outlet too!
The plasterers should be finished by the end of July - they are off on their holidays then.
Keine Kommentare:
Kommentar veröffentlichen