The fire place has arrived. There was a lot of cladding and heat-proofing to do because of the sliding door which disappears behind the fire. Yesterday the built-in seating was started around it but the final surface is not on yet.
|
Log fire prior to installation |
Also, because the glazier has still not fitted the big window in the staircase, the heat pump has been having a bit of a struggle. The engineers were round yesterday trying to coax a few more mega Watts from the national grid through my bank account and into the outside fan.
|
Engineer looking inside outside part of heating system |