Hard-core brutalism and temporary mollification
Most of the brutalist concrete work is in place in the garden, along the edge of the brook. The individual elements have now been put together along with the big steps/bench above the rain-water pool.
Three segments of retaining wall sequence with rain-water pool and steps/bench in place
We still need the steps between the wall sections to be placed, and the front/drop edge of the pool to have its camber inverted - don't ask.