Donnerstag, 6. Juni 2013

Work on final ceiling started

As the first panels for the pre-ceiling on the top floor go in, the scaffolding has gone up another floor.  This gave us the chance to get a look inside the top floor of the house from roof level.


Looking through the ceiling of bedroom
  The ceiling will be the flat roof and will be build the same way as the other floor/ceiling ... first drop a load of roughly cut pre-reenforced thin concrete slabs on to of beams held up by poles, then patch the gaps from underneath with planks and things, then use this as a base to form the remaining 30 cm of concrete and steel work.

Ceiling not quite water tight yet.


Keine Kommentare:

Kommentar veröffentlichen