Mittwoch, 6. März 2013

Spring's here and the builder are back in action

Resumption


At last the temperature has warmed up enough to allow the builders to carry on where they left off.  They have coated the outside of the cellar walls in a dark layer of special stuff which allows them to stick on the insulation.

Corner of cellar showing curve at front left of house

Insulation being allpied along Blütenweg side

The site looks a bit of a jumble, but I'm sure the experts have everything under control.

Shuttering, crane, portable shed and toilet (plus other sundry stuff) on site

Keine Kommentare:

Kommentar veröffentlichen