At last the temperature has warmed up enough to allow the builders to carry on where they left off. They have coated the outside of the cellar walls in a dark layer of special stuff which allows them to stick on the insulation.
![]() |
| Corner of cellar showing curve at front left of house |
![]() |
| Insulation being allpied along Blütenweg side |
The site looks a bit of a jumble, but I'm sure the experts have everything under control.
![]() |
| Shuttering, crane, portable shed and toilet (plus other sundry stuff) on site |