Donnerstag, 6. Dezember 2012

Cellar walls finally poured

Cellar walls finally poured


The last parts of the exterior cellar walls were poured today.  I thought it was too cold (about +1 C) but the concrete itself was 13 C, and that is what they were interested in.

Wobbly bridge to let builder get to inner cellar gantry

Curved corner of the cellar near junction of Ringstraße and Blüten Weg

View along the top of the cellar wall along Blüten Weg (standing on the wobbly bridge)
The next step should be the removal of the shuttering next week.  The waterproof part of the house is now basically constructed.

We have the biggest private swimming pool in Roßdorf ready in time for winter.  Yippee.