Dienstag, 24. September 2013

Meanwhile, on the allotment ...

Back on the Rehberg the allotment is doing its thing.  There are a few plants doing well, mainly the chilis. Only yellow/green stuff seems to be producing.



The competition class for this year's show was sweetcorn.  Mine all got eaten in the ground my the voles - I don't mind because the voles are pretty cute.  A friend gave me some smallish plants at the plan swop party and I was able to grow them on.  I don't think I will be winning any prizes this year.


Dienstag, 17. September 2013

Ground floor front exterior wall

The stone masons are onsite and putting up the wall across the front of the ground floor of the house.  This will then curve away across the plot to form the inner yard.


Montag, 9. September 2013

Peering into the void (Luftraum)

For a moment today, the temporary covering of the Luftraum (void in the ceiling/floor) adjacent to the staircase was removed.  It was the first chance to see the interplay of the staircase shaft with the opening into the upstairs hallway.

View from inside the front door up through the ceiling/floor

It may not sound much. but it makes the whole thing feel much more 3-dimensional.  You can see right into KZM (Maren's room) from the front door.  In the end the banister/railing around the Luftraum/void will change things again, but I looks pretty good for now.